Week3: Full-scale Meeting

For week3, my team and I had a meeting with Dr.Furman and the management team. We discussed with the clients to see what were the requirements they had so we could change our design to meet their requirements. The two main requirements that the clients asked were the curvature of the solar rack design and the water gutter. Therefore, next step for our team is to change the design.

Comments

Popular posts from this blog

Week 13 and week 14: Fabricating the Prototype and Work on the Finite Element Analysis

Week 7 and 8: CFD Simulation and Updated Bill of Materials

Week5 & 6: Water Gutter Design and Solar System Connections