Week1: First Meeting for the Spring Semester

This week we had a first meeting. My team and I were working on the bill of material. According to Ron, the full scale prototype now has to be shortered by 6m, instead of 9m long. This is a big challenge for the solar team because we have to change our previous design to meet the new requirements and aslo to reduce the cost of materials.

Comments

Popular posts from this blog

Week 7 and 8: CFD Simulation and Updated Bill of Materials

Week 13 and week 14: Fabricating the Prototype and Work on the Finite Element Analysis

Week5 & 6: Water Gutter Design and Solar System Connections